DT_BOM
Fill the PV3.1 equipment materials (BOM) table.
Rebuilds the EQUIPMENT MATERIALS (bill of materials) table on the PV3.1 sheet from the project's permit BOM. If managed DT_ATTACH geometry exists, its drawing recount replaces the attachment estimate.
On the ribbon: JobEngine → Drawing Tools → BOM — the button appears only while PV3.1 is the active layout.
When to use it
After LOAD_DT, when you're working the PV3.1 sheet.
Prerequisites
Same as the wire schedule — LOAD_DT run on this drawing first, PV3.1 layout active.
Common problems
| Message | What to do |
|---|---|
Cannot fill the PV3.1 BOM yet. … No BOM cache on this drawing — run LOAD_DT first. | Run LOAD_DT, then re-run. If LOAD_DT noted the session has no permit BOM, complete the design wizard in JobEngine first, then re-run LOAD_DT. |
This drawing's cached BOM belongs to a different session — run LOAD_DT for the current session. | Run LOAD_DT and pick the right session. |
Attachment QTY. shows (est. - live count unbound) | The template's legacy live-count bridge could not bind. The state is saved visibly in the drawing; run DT_BOM after managed attachments exist to replace it with the drawing recount. |
RACKING COHERENCE warning | The session projected zero attachments while dependent rail or washer quantities are nonzero. Verify the BOM in JobEngine; if managed attachments already exist, their drawing recount remains authoritative. |