DT_BOM

Fill the PV3.1 equipment materials (BOM) table.

Rebuilds the EQUIPMENT MATERIALS (bill of materials) table on the PV3.1 sheet from the project's permit BOM. If managed DT_ATTACH geometry exists, its drawing recount replaces the attachment estimate.

On the ribbon: JobEngine → Drawing Tools → BOM — the button appears only while PV3.1 is the active layout.

When to use it

After LOAD_DT, when you're working the PV3.1 sheet.

Prerequisites

Same as the wire schedule — LOAD_DT run on this drawing first, PV3.1 layout active.

Common problems

MessageWhat to do
Cannot fill the PV3.1 BOM yet. … No BOM cache on this drawing — run LOAD_DT first.Run LOAD_DT, then re-run. If LOAD_DT noted the session has no permit BOM, complete the design wizard in JobEngine first, then re-run LOAD_DT.
This drawing's cached BOM belongs to a different session — run LOAD_DT for the current session.Run LOAD_DT and pick the right session.
Attachment QTY. shows (est. - live count unbound)The template's legacy live-count bridge could not bind. The state is saved visibly in the drawing; run DT_BOM after managed attachments exist to replace it with the drawing recount.
RACKING COHERENCE warningThe session projected zero attachments while dependent rail or washer quantities are nonzero. Verify the BOM in JobEngine; if managed attachments already exist, their drawing recount remains authoritative.