DT_WIRE_SCHEDULE
Create the PV4 equipment wire schedule table.
Creates the equipment wire schedule table on the PV4 sheet — the FROM/TO conductor and raceway listing — sized to exactly as many rows as the project needs, with the standard formatting built in. It's placed automatically at the standard spot on the sheet; you're only asked to click a location if the sheet layout isn't recognized.
On the ribbon: JobEngine → Drawing Tools → Wire Schedule — the button appears only while PV4 is the active layout.
When to use it
After LOAD_DT, when you're working the PV4 sheet.
Prerequisites
LOAD_DTrun on this drawing first — that's what fetches and caches the wire schedule data.- The PV4 layout active.
- On a template with no session loaded, the command fills the table with clearly-labeled sample rows instead — useful for checking layout, not for permits.
Common problems
| Message | What to do |
|---|---|
Cannot fill PV4 wire schedule yet. … No wire schedule cache on this drawing — run LOAD_DT first. | Run LOAD_DT, then re-run. If LOAD_DT warned that the session has no wire schedule data, finish the wiring steps of the design wizard in JobEngine, then run LOAD_DT again. |
This drawing's cached wire schedule belongs to a different session — run LOAD_DT for the current session. | The drawing was last loaded with a different project. Run LOAD_DT and pick the right session. |